Move. Don't break.

From old servers to AWS or Google Cloud, with a rehearsed cutover.

Yarify migrates applications from on-prem servers, VPS hosting or legacy platforms to AWS or Google Cloud. We inventory what runs today, containerise the app, define the target in Terraform, rehearse the data migration and cut over with a rollback plan, usually with minutes of downtime or none. A defined migration gets one fixed written quote after an assessment. The cloud accounts are yours from day one.

A migration, in five pictures

  • Inventory

    Everything that runs today

  • Containerise

    Same build everywhere

  • Target in Terraform

    Reviewed, repeatable

  • Rehearse data

    Restore, verify, time it

  • Cut over

    With a rollback plan

Where teams migrate from

  • On-prem servers

    Hardware nearing end of life, a server room nobody wants to own, backups on tape.

  • VPS and shared hosting

    One box doing everything, updated by hand, no staging and no autoscaling.

  • A platform you outgrew

    A legacy PaaS or managed host whose bill grows faster than your traffic.

  • Cloud to cloud

    AWS to Google Cloud or back, for credits, pricing, data residency or a parent company's standard.

Cloud server infrastructure in a data centre

Rehost, replatform or refactor?

Not every workload deserves a rewrite. We pick per component and write down why.

ApproachWhat changesWhen it fits
Rehost (lift and shift)Same app on cloud VMsHard deadline, stable app, refactor later
ReplatformContainers, managed database, managed queuesMost web apps and APIs; the usual sweet spot
RefactorParts redesigned for cloud servicesScaling limits or costs that a move alone won't fix
Retire or replaceSwitched off or swapped for SaaSInternal tools nobody maintains

These map to the common migration strategies (often called the 7 Rs) described in AWS and Google Cloud migration guidance.

How we run a cloud migration

  1. Assessment · Weeks 1–2

    Inventory of apps, data, dependencies, DNS, email and cron jobs. Written plan and fixed quote.

  2. Build the target · Next

    Containers, Terraform, networking, secrets and CI/CD in your new cloud account.

  3. Rehearse · At least once

    Copy production data to the new environment, test the app, time every step.

  4. Cutover · Agreed date

    A scheduled window, a written runbook, DNS switched, rollback ready.

  5. Watch and decommission · After cutover

    Monitoring through the first weeks, then the old servers are switched off.

What usually breaks in a migration

We check for these during the assessment, not on cutover night.

  • Cron jobs and scripts nobody documented
  • Hard-coded IP addresses and file paths
  • Email sending that depended on the old server's reputation
  • Files stored on local disk instead of object storage
  • Database versions and extensions that differ in the managed service
  • DNS TTLs left at a day, so rollback takes a day
Engineer reviewing server infrastructure before a cloud cutover

One quote for the whole move.

After the assessment you get a written migration plan and one fixed quote for it. Optional follow-up work, like refactoring a component, is quoted separately before it starts. Your cloud accounts, your Terraform, your runbooks.

DevOps services

Questions buyers ask us

How long does a cloud migration take?

A single web application with one database often moves in a few weeks including the assessment and a rehearsal. Many services, large data volumes or compliance reviews take longer. The assessment gives you a dated plan before you commit.

Will there be downtime?

Usually minutes, sometimes none. Stateless parts can run in both places at once; the database is the hard part. We rehearse the data move, measure how long it takes and choose between a short maintenance window and replication with a near-instant switch.

AWS or Google Cloud?

Both are solid. We look at your team's experience, existing contracts and credits, managed services you need, and data-residency rules. If you have no preference, we recommend one with reasons. We work in either, in your own accounts.

Will the cloud be cheaper than our servers?

Not automatically. A lift and shift of oversized servers can cost more. Savings come from rightsizing, autoscaling, managed services that replace manual work, and switching off what nobody uses. We estimate monthly cloud cost in the plan, before you move.

Do we have to rewrite the application?

Rarely. Most apps move with containerisation and configuration changes: environment variables, object storage for files, a managed database. We refactor only components where a move alone won't fix a real problem, and quote that separately.

Can you migrate an app we didn't build?

Yes. Most migrations we do are of code someone else wrote. The assessment covers the codebase too, and if it needs fixing first we say so. See code audit and software rescue.

Leave the old servers behind

A free 30-minute call. Tell us what runs today and where it should run next.

Tell us what you're building

Prefer to talk? Pick a 30-minute slot.

sales [at] yarify.tech WhatsApp Telegram